Bluewater Bridge Canada

Project Details

Bluewater Bridge Canada was a redevelopment project that was undertaken in several phases. The CBA Complex, parking and servicing areas, commercial vehicle secondary inspection area, VACIS garage and gates and security was all part of the scope of work. In the CBA Complex was a 4 storey building approximately 10,800 square meter that included administration, commercial operation, inspection agency, and customer broker operations. This project was constructed in accordance with LEED requirements. The mechanical scope of work included a pad mounted transformer, a natural gas powered generator, and duct work to connect existing electrical and communication to the facilities within the plaza. L.J. Barton Mechanical installed infloor heating, solar panels, rooftop units, boilers, underground tanks and more.

Location: Sarnia, ON
Client: Bluewater Bridge Corporation

Engineer: NORR Consultants
General Contractor: McKay Cocker Construction

Project Duration: March 2009 – November 2011